Solar Assistance managed the entire process, from dismantling to recommissioning.
After the roof works, a team was deployed immediately. Within 48 hours, 252 panels were reinstalled and correctly connected. The entire system was checked to ensure it was safe and operating optimally again.
Thanks to this structured approach, downtime was limited and Versus Omega was able to resume energy production quickly.